Skip to content
BeSir
CASE 04CompletedEquipment monitoring · Manufacturing

Veteran engineers’ sensor know-how turned into 24/7 operations

Steel Manufacturer PA top Korean steel manufacturer · limited disclosure
“The sensor data was there. What no one could do was keep interpreting every signal.”

Problem

The equipment emits dozens of sensor signals every second, each meaning something different. Signals inside a defined range can be checked against the manual, but the changes and combined signals the manual does not cover could only be read by veteran engineers.

  • Unreadable signalschanges and combinations the manual does not cover
  • No continuous watchno one can watch time series at that volume
  • Personnel dependencyjudgment rests on the few who can read the signals

What BeSir did

Build 24/7 sensor monitoring so that even a non-expert can immediately see an abnormal state and what to do about it.

  • Structures the relationships between sensor states and signals as an ontology, analyzing the time-series stream 24/7 to detect signals that deviate from normal
  • Encodes how veteran engineers judge and respond to anomalies as the response criteria
  • Monitors every sensor signal on a single dashboard
  • On an anomaly, presents the related sensors, the likely cause, and the relevant manual and action
  • Sends an automatic alert the moment a sensor value crosses its threshold

Results

3 / 3
Anomaly cases detected
PoCevery anomaly case provided was detected
  • PoC

    Every sensor signal structured into one real-time model

  • PoC

    Response procedures and manuals linked by anomaly type

  • PoC

    Non-experts can read equipment state and the required action

The data preprocessing foundation for 24/7 real-time detection was built. The project ran at a national security facility, so site identifiers, system names, screens and raw sensor data are excluded here; signal types and sampling rates are outlined only.

Verified confirmed in the operating environment · PoC confirmed within PoC scope · Target a target set on work in progress · Estimate calculated from the stated assumptions

Start with one agent.Keep the ability to build the rest.

Steel Manufacturer P — Veteran engineers’ sensor know-how turned into 24/7 operations | BeSir